Head back home!

The N Scale

White River and Northern

Model Railroad

 
Let the tracklaying begin

Let the tracklaying begin

The handlaid turnouts in the WR&N II engine facility began with lots of double-stick foam tape. Some of the long, high-speed turnouts for the mainline were already under way in the background.

Image specs: This is a scan of a 3x5 print taken with a 35mm camera of unknown type. The negative is long gone.

Continue to next image
Return to Clinic

Copyright © 2006-2008 by David K. Smith. All Rights Reserved.
Nothing contained in this website may be reproduced in any form
without the express written consent of the copyright holder.