|
||||
![]() Let the tracklaying begin The handlaid turnouts in the WR&N II engine facility began with lots of double-stick foam tape. Some of the long, high-speed turnouts for the mainline were already under way in the background. Image specs: This is a scan of a 3x5 print taken with a 35mm camera of unknown type. The negative is long gone. Continue to next image Copyright © 2006-2008 by David K. Smith.
All Rights Reserved. |