Head back home!

The N Scale

White River and Northern

Model Railroad

 
Roughing out the turnouts

Roughing out the turnouts

After applying the styrene ties directly to the double-stick foam, sections of flex track with ties removed were placed over top. The rails were shifted around until there were no joints on the stock rails through the turnouts. In this image, the rails that meet at the frogs were clipped to length, and all of the rails were heat-bonded to the styrene ties.

Image specs: This is a scan of a 3x5 print taken with a 35mm camera of unknown type. The negative is long gone.

Continue to next image
Return to Clinic

Copyright © 2006-2008 by David K. Smith. All Rights Reserved.
Nothing contained in this website may be reproduced in any form
without the express written consent of the copyright holder.