|
||||
![]() |
||||
November 5, 1988 That's the date scrawled on the board I am holding up in front of me. By this time more than half of the benchwork was completed. The WR&N II's benchwork was traditional L-girder, still considered "best practice" at the time, and I took great pride in its careful, precise construction. All of the joints were glued and screwed, except for the legs which were attached with lag bolts. I designed all of the benchwork so it could be dismantled. Boy, was I dreaming... Image specs: This is a scan of a 4x6 color print taken with a 35mm camera of unknown type. The negative is long gone. |
||||
Copyright © 2006-2008 by David K. Smith.
All Rights Reserved. |